As Taiwan continues to develop high-rise residential buildings, commercial towers and major infrastructure projects, contractors face increasing pressure to deliver projects faster while maintaining exceptional structural quality and meeting stringent safety requirements.

This guide explores the most widely used high-rise building formwork systems in Taiwan, compares their applications, and explains how selecting the right system can improve productivity, quality and project profitability.

What is a High-rise Building Formwork System?

A high-rise building formwork system is a temporary structural framework used to shape and support fresh concrete until it reaches sufficient strength.

A complete formwork solution typically consists of:

Modern construction projects increasingly rely on engineered formwork systems such as:

  • Steel Formwork
  • Aluminium Formwork
  • System Formwork
  • Polymer Formwork


Compared with conventional timber formwork, these systems deliver greater standardisation, improved construction accuracy and significantly higher on-site productivity.

Comparing Common Formwork Systems Used in Taiwan

Selecting the most appropriate formwork system depends on project requirements, construction methodology and long-term cost efficiency. Below is a comparison of the systems most commonly used across Taiwan's construction industry.

  • Workers working with timber formwork on site

    Traditional Timber Formwork

    Timber formwork remains a practical solution for smaller or irregular projects where flexibility is more important than productivity.

    Typical Applications

    • General construction project

     

    Key Advantages

    • Lower initial investment
    • Highly adaptable for bespoke construction
    • Easy to modify on site

     

    Considerations

    • Labour-intensive installation
    • Less consistent concrete quality
    • Higher material waste
    • Longer construction programmes
    • Limited reuse
  • Aluminium Formwork

    Aluminium formwork is widely adopted for residential developments with repetitive floor layouts.

    Typical Applications

    • Residential towers
    • Buildings with highly repetitive standard floors

     

    Key Advantages

    • High reuse potential
    • Faster construction cycles
    • High dimensional accuracy
    • Consistent concrete finishes

     

    Considerations

    • Higher upfront investment
    • Requires comprehensive planning before construction
    • Suitable only for standard floors
  • Due to the manageable dimensions of the DUO panels, these are also ideally suited for the construction of foundations.

    System Formwork

    Polymer system formwork offers exceptional flexibility for projects with varying structural layouts while reducing dependence on cranes and specialist formwork carpenters.

    Example: Polymer system formwork (DUO System Formwork)

    Typical Applications

    • Residential and commercial buildings (For both standard and special floors)
    • Basement structures
    • Industrial facilities
    • MRT and railway projects
    • Civil engineering works
    • Retaining walls

     

    Key Advantages

    • Lightweight components that can be handled manually
    • Significantly reduces crane lifting operations
    • Fast and simple assembly requiring minimal training
    • Highly adaptable to different project layouts
    • Improved site safety
    • Reduce construction time
    • Reduced crane dependency

     

    Considerations

    • Higher upfront investment
    • More suitable for projects with plain structures

     

  • PERI climbing formwork in used in a high-rise building constuction project

    Climbing Formwork Systems

    Climbing formwork is specifically designed for vertical concrete structures and is essential for many high-rise and infrastructure projects.

    Example: Climbing Formwork, Automatic Climbing Systems, Rail-guided Climbing Systems

    Typical Applications

    • High-rise buildings
    • Bridge construction
    • LNG terminals

     

    Key Advantages

    • Significantly reduces crane lifting operations
    • Improved site safety
    • Reduce construction time
    • Minimises working-at-height risks
    • Enables continuous vertical construction with predictable cycle times


    Considerations

    • Higher upfront investment
    • Suitable for projects with high-rise structure

How to Choose the Right Formwork System for Your Project

Selecting the right formwork system is one of the most important decisions in any construction project. The optimal solution depends on the type of construction, building height, project environment, floor repetition, project schedule, labour availability and concrete finish requirements.

The optimal solution depends on the type of construction, building height, project environment, floor repetition, project schedule, labour availability and concrete finish requirements.

By evaluating these factors early in the planning stage, contractors can improve construction productivity, reduce project risks and maximise long-term cost efficiency.

Consider the Building Height

As buildings become taller, construction methods become increasingly complex. Formwork systems must not only support higher structural loads but also enable safe and efficient vertical construction.

For medium to high-rise developments, contractors typically consider:


Climbing formwork systems are particularly effective for vertical concrete structures, allowing work to progress safely and efficiently as the building rises.

For projects with irregular floor layouts or multiple structural transitions, polymer system formwork provides greater flexibility while maintaining productivity throughout the construction process.

Evaluate Floor Repetition

Buildings with a large number of identical standard floors often benefit from highly repetitive construction methods.

Aluminium Formwork is ideal when:

  • Standard floor layouts remain consistent
  • High reuse rates can be achieved
  • Large production volumes justify the initial investment
  • Fast construction cycles are a priority

The high repetition of standard floors allows contractors to reduce the average formwork cost per floor over the life of the project.

However, aluminium formwork is generally less suitable for:

  • Basement levels
  • Transfer floors
  • Podium structures
  • Buildings with frequently changing layouts


Projects with multiple non-standard floor plans may benefit from a more adaptable modular system, like DUO System Formwork.

Consider Programme Constraints and Labour Availability

Taiwan's construction industry continues to experience labour shortages, making construction productivity more important than ever.

Where project schedules are tight, system formwork can significantly improve site efficiency by:

  • Shortening cycle times
  • Simplifying assembly and dismantling
  • Reducing dependence on highly skilled formwork carpenters
  • Improving concrete pouring efficiency
  • Reducing crane utilisation through lightweight components

Polymer formwork systems such as PERI DUO are designed for manual handling, enabling smaller site teams to complete installation efficiently while maintaining consistent quality.

For contractors facing increasing labour costs, adopting a modular formwork system can help maintain project schedules without compromising safety or construction quality.

Consider the Required Concrete Finish Quality

The required concrete finish should be considered during the formwork selection process.

Projects requiring fair-faced concrete demand high-precision formwork systems capable of delivering consistent surface quality with minimal remedial work.

Key requirements include:

  • High dimensional accuracy
  • High-quality panel formlining
  • Precise panel alignment
  • Tight joint control to minimise grout leakage
  • Consistent concrete pressure management
Concrete finishing of DUO in a residential project
DUO System Formwork used as wall formwork

Selecting an engineered formwork system helps achieve superior architectural concrete finishes while reducing repair work and improving overall project quality.

Formwork Safety Considerations for Construction Projects

Safe formwork operation is fundamental to successful concrete construction. Contractors are often expected to implement robust planning, engineering verification and site safety procedures before and during concrete pouring.

Critical safety considerations include:

  • Formwork and shoring stability
  • Fall protection for work at height
  • Concrete load management during pouring
  • Safe lifting and crane operations
  • Controlled assembling and dismantling procedures
  • Regular inspection of temporary works

A properly engineered formwork solution not only protects workers but also reduces construction delays and costly rework.

When planning formwork operations in Taiwan, contractors should also refer to applicable local regulations and engineering standards, e.g.:


Combining engineered formwork systems with detailed planning and professional technical support helps ensure safer and more predictable project delivery.

 

 

How PERI Formwork Systems Improve Construction Efficiency

Modern construction demands more than durable formwork—it requires integrated engineering solutions that improve productivity, reduce project risks and support efficient project management.

PERI's modular formwork systems, combined with our bespoke engineering services, help contractors optimise every stage of the construction process.

Project teams can benefit from:

  • Reduced construction errors through engineered planning
  • Higher formwork utilisation and faster turnaround
  • Shorter cycle times
  • Lower labour requirements
  • Improved site safety and workflow management
  • More efficient logistics and material handling
The benefit of using PERI DUO System Formwork on site

Beyond supplying formwork equipment, PERI provides comprehensive engineering support throughout the project lifecycle.

Our services include:

This integrated approach enables contractors to improve productivity while maintaining high standards of quality, safety and cost control across projects of every scale.

See how PERI DUO System Formwork helped a contractor improve construction efficiency, simplify on-site operations and reduce labour requirements.

FAQ Section

Frequently Asked Questions About High-rise Building Formwork

DUO is a lightweight, yet strong and durable innovative technopolymer formwork system with no component part weighing more than 25kg.

Looking for a High-rise Building Formwork Solution?

Whether you're planning a residential tower, commercial development or major infrastructure project, PERI provides engineered formwork solutions tailored to your construction requirements.

Speak with us today to discover how the right formwork solution can improve productivity, safety and project performance.

Reference Projects

Related Products