Tseung Kwan O - Lam Tin Tunnel Landscape Deck
Tseung Kwan O,
Hong Kong
The Tseung Kwan O – Lam Tin Tunnel (TKOLTT) is approximately 4.2 km long, connecting Tseung Kwan O and East Kowloon. It is to construct an approximately 3.8 km dual two-lane highway and the facilities and associated buildings such as civil, structural, marine, electrical and mechanical, traffic control and surveillance system, landscaping, as well as environmental mitigation measures.
One of the largest parts of the project is its landscape deck.
-
BenefitsHigh load-bearing shoring system
-
BenefitsFast assembly and dismantling
-
BenefitsIntuitive installation
The Project
PS100 Shoring has a permissible load of up to 100 kN per leg and was used to cope with the project requirements due to its compatibility and high load bearing.
The HDS Heavy Duty Shoring is the optimal solution for the construction of pre-cast segmental bridges.
PS100 Shoring has a permissible load of up to 100 kN per leg and was used to cope with the project requirements due to its compatibility and high load bearing.
The HDS Heavy Duty Shoring is the optimal solution for the construction of pre-cast segmental bridges.
Project Information