Taoyuan MRT Green Line is a metro line currently under construction in Taoyuan. Upon completion, it will connect with the Taoyuan Airport MRT at Hengshan and Kengkou. PERI provided materials for the construction of the G01 station.<br/><br/>

Taoyuan Metro Green Line G01 Station
Taoyuan, Taiwan

PERI provided PS 100 Shoring System for the project to offer high load-bearing capacity and rapid assembly and disassembly, and used DUO System Formwork for concrete construction.

Location
Project participants
Customer: WEILIN CONSTRUCTION CO. LTD
  • Benefits

    PS 100 Shoring System boasts high load-bearing capacity and rapid assembly and disassembly.

  • Benefits

    Almost all DUO System Formwork operations can be performed without additional tools.

  • Benefits

    DUO System Formwork is easy to understand and assemble, allowing less-experienced formwork workers to work quickly and efficiently.

  • Benefits

    Using DUO System Formwork shortens construction time and reduces costs.

The Project

Impressions from the project process

Project Information

Related Products

Want to know how PERI can support your project?

We will tailor the most optimal solution to meet your specific requirements.

We will tailor the most optimal solution to meet your specific requirements.

Taoyuan MRT Green Line is a metro line currently under construction in Taoyuan. Upon completion, it will connect with the Taoyuan Airport MRT at Hengshan and Kengkou. PERI provided materials for the construction of the G01 station.<br/><br/>
Taoyuan MRT Green Line is a metro line currently under construction in Taoyuan. Upon completion, it will connect with the Taoyuan Airport MRT at Hengshan and Kengkou. PERI provided materials for the construction of the G01 station.<br/><br/>