Lei Tung Station - Entrance "B" Shaft
Ap Lei Chau,
Hong Kong
Entrance shaft to the underground station.
- Concrete lining to the escalated shaft
- 4 No. lift shafts
- Total Height: 52.47 m
- Total Depth: 40.60 m
- Shaft above ground: 11.87 m high, 4-storey structure
Construction period: March - September 2015
Location
The Project
Impressions from the project process
Installation of the lift shaft formwork system in progress.
Installation of the lift shaft formwork system in progress.
Part of the single-sided climbing formwork system to the shaft lining.
Installation of the lift shaft formwork system in progress.
Installation of the lift shaft formwork system in progress.
Part of the single-sided climbing formwork system to the shaft lining.