Harbour Area Treatment Scheme - PTW Drop Shafts & Scum Chambers
Hong Kong Island,
Hong Kong
The Harbour Area Treatment Scheme - PTW Drop Shafts & Scum Chambers Shaft Sites project involves the construction of four PTW dropshafts and scum chambers:
Aberdeen PTW Dropshaft & Scum Chamber
Overall Depth: 9.20 m
Wah Fu PTW Dropshaft & Scum Chamber
Overall Depth: 22.50 m
Cyberport PTW Dropshaft & Scum Chamber
Overall Depth: 17.80 m
Sandy Bay PTW Dropshaft & Scum Chamber
Overall Depth: 18.80 m
From July to October 2014, the project involved concrete lining of pre-excavated shafts, each with a uniquely designed scum chamber. The Wah Fu shaft features an elliptical design with a lining size of 7 m by 5 m, while the other shafts are circular with a diameter of 8 m.
Executed with a focus on efficiency and safety, the project ensured rapid construction and minimal disruption. Optimized dimensions facilitated easy operation, prioritizing worker safety throughout the process. Overall, the Shaft Sites project significantly enhances the area's wastewater management infrastructure.
The Project
Impressions from the project process
The first strip of typical circular system.
Purpose-made circular walers to determine form profile.
Site pre-assembly of elliptical form for Wah Fu Shaft.
Purpose-made elliptical walers to determine form profile.
The first strip of typical circular system.
Purpose-made circular walers to determine form profile.
Site pre-assembly of elliptical form for Wah Fu Shaft.
Purpose-made elliptical walers to determine form profile.
Project Requirements and Solutions
We will tailor the most optimal solution to meet your specific requirements.