Central Kowloon Route
Kowloon,
Hong Kong
The whole CKR project is the construction of a 4.7 km long dual three-lane dual carriageway linking the West Kowloon and East Kowloon, which includes the construction of the dual three-lane central tunnel.
PERI has provided the technical formwork and falsework solutions and on-site support for the main structure throughout the project.
The Project
Impressions from the project process
PS 100 was used to construct the roof slabs of the project. PS 100 shoring system optimises and accelerates the installation process.
PS 100 is used for the top slab shoring in the project.
PS 100 was used to construct the roof slabs of the project. PS 100 shoring system optimises and accelerates the installation process.
PS 100 is used for the top slab shoring in the project.
Project Solutions
We will tailor the most optimal solution to meet your specific requirements.